Client: Harbin Dongtai Boiler Environmental Protection Co., Ltd. (General Contractor for Dunhuang Yongsheng Heating Co., Ltd.)
Equipment Models:
BAE-160A* Two units BAE-45PM* Two units
The EPC contractor representative has delivered documents for the four air compressors and air receivers to the Xinjiang site; on-site acceptance cannot be conducted. A video conference confirmation is scheduled for tomorrow. Commissioning work has been completed. Equipment is operating normally.