GESO SYSTEMS' commissioning service cases:
Company name: Aerospace Sea Eagle Special Materials Co., Ltd.
Equipment model: GNZ-360/6-30
Debugging time: 2024.5.30
Debugging results: The new machine has been replaced, the pipeline has been rectified, the startup and debugging have been completed, and the equipment is running normally. Problems on site: 1. There is a crack on the glass baffle of the booster pump, and a hexagonal fastening screw has been stripped. Because this baffle is the oil leakage fault point of the booster, follow-up use observation 2. The nameplate needs to be punched because the electric control cabinet needs to be punched. The equipment will be put on later. 3. After the pressure gauge at the outlet is calibrated, there is a 0.316MPa error with the reading of the customer's nitrogen gas storage tank intelligent pressure gauge. Later, the upper limit of the outlet pressure gauge was adjusted to 2.284Mpa and the lower limit was 2.184Mpa according to the customer and the supplier. The customer is off work. After communicating with the customer, there is no problem in using it and sign the acceptance form
commissioning serviceg news & updates. Enter your e-mail and subscribe to our newsletter.
Contact Us https://www.gesosystems.com/
+86 13812618315 / 18317054083400-8850-919
kyle@gesosystems.com
No.26, Lane 38, Caoli Road, Fengjing town, Jinshan District, Shanghai
Mon-Fri: 9:00am-6:00pmSat-Sun: 10:00am-5:00pm
© 2024Copyright ©2021 abc All Rights Reserved